Team:BostonU/FusionProteinsNotebook
From 2014.igem.org
(Difference between revisions)
Line 210: | Line 210: | ||
<li> Volunteered to take over and finish the InterLab Study. | <li> Volunteered to take over and finish the InterLab Study. | ||
</tr> | </tr> | ||
- | <tr><th colspan="2" scope="col"><h3>Week of | + | |
+ | <tr> | ||
+ | <th colspan="2" scope="col"><br><h2>September</h2></th> | ||
+ | </tr> | ||
+ | |||
+ | <tr><th colspan="2" scope="col"><h3>Week of September 1</h3></th></tr> | ||
<tr><th colspan="2" scope="col"> | <tr><th colspan="2" scope="col"> | ||
Line 217: | Line 222: | ||
<ul> | <ul> | ||
- | <li> | + | <li> Ran MoClo to assemble the following Level 2s -<ol type= "I"> |
+ | <li>Enter Picture | ||
+ | <li>J00-C12_AE - R10-C40-E40m_EF - R40-E10_FG | ||
+ | <li>J00-C12_AE - R10-C40-E30_EF - R40-E10_FG | ||
+ | <li>J00-C12_AE - R10-C40_EF - R40-E10_FG | ||
+ | <li>J00-C12_AE - R10-E30_EF - R40-E10_FG | ||
+ | <li>J00-C12_AE - R10-E40m_EF - R40-E10_FG | ||
+ | <li>J00-C12_AE - R10-C80-E40m_EF - I13-E10_FG | ||
+ | <li>J00-C12_AE - R10-C80-E30_EF - I13-E10_FG | ||
+ | <li>J00-C12_AE - R10-C80_EF - I13-E10_FG | ||
+ | <li>J00-C12_AE - R10-E30_EF - I13-E10_FG | ||
+ | <li>J00-C12_AE - R10-E40m_EF - I13-E10_FG</ol> | ||
+ | * All constructs contain BCD2_BC as 5' UTRs and B0015 as terminators. | ||
+ | <li>Also, made frozen glycerol stocks for J00-C12m_AE and R10-C40-E40m_EF | ||
<br> | <br> | ||
</tr> | </tr> |
Revision as of 19:26, 22 September 2014
The notebook below describes all the steps that were taken in constructing, and testing fusion proteins. | |
---|---|
June |
|
Week of June 23 |
|
Decided to make the following Level 0 Coding Sequences: C0040_CI C0080_CI E0040m_ID E0030_ID
| |
Week of June 30 |
|
This week was about sequence verifying the genes made earlier and laying down the plan for final testing of the fusion protein.
| |
July |
|
Week of July 7 | |
This week I ran into problems with Kan plates, due to which I lost a lot of time.
I then redid the transformations on new plates and could hence see blue and white colonies.
Poured LB, LB+Amp, and LB+Kan plates | |
Week of July 14 | |
This entire week I used the Google Glass for all my wet lab work. This was a part of a study run by the Human Computer Interaction Lab at Wellesley College. This week involved troubleshooting and making more of some Level 0 mini prep stocks were exhausted.
| |
Weeks of July 21 and July 28 | |
Finally, I finished making the Level 1s.
| |
August |
|
Week of August 4 | |
Troubleshooting for J00-C12m_AE and R10-C40-E40m_EF units
| |
Week of August 11 | |
Testing WPI constructs and more cloning issues
| |
Week of August 18 and August 25 | |
More FACS testing
| |
September |
|
Week of September 1 | |
|