Team:BostonU/FusionProteinsNotebook
From 2014.igem.org
(Difference between revisions)
Line 195: | Line 195: | ||
<li> Ran MoClo on both constructs again and ran colony PCRs on 10 colonies each. | <li> Ran MoClo on both constructs again and ran colony PCRs on 10 colonies each. | ||
<br> | <br> | ||
- | <center><img src="https://static.igem.org/mediawiki/2014/d/d5/0831-1YABUWiki.tif" width="700" height=" | + | <center><img src="https://static.igem.org/mediawiki/2014/d/d5/0831-1YABUWiki.tif" width="700" height="200" alt="Gel_8-31" style="float:center"></center> |
- | <center><img src="https://static.igem.org/mediawiki/2014/f/f1/0831-2YABUWiki.tif" width="700" height=" | + | <center><img src="https://static.igem.org/mediawiki/2014/f/f1/0831-2YABUWiki.tif" width="700" height="200" alt="Gel_8-31" style="float:center"></center> |
<capt><br><center>Picked only two colonies each for sequencing but kept others on a stab plate</center></capt> | <capt><br><center>Picked only two colonies each for sequencing but kept others on a stab plate</center></capt> | ||
<br> | <br> |
Revision as of 16:38, 22 September 2014
The notebook below describes all the steps that were taken in constructing, and testing fusion proteins. | |
---|---|
June |
|
Week of June 23 |
|
Decided to make the following Level 0 Coding Sequences: C0040_CI C0080_CI E0040m_ID E0030_ID
| |
Week of June 30 |
|
This week was about sequence verifying the genes made earlier and laying down the plan for final testing of the fusion protein.
| |
July |
|
Week of July 7 | |
This week I ran into problems with Kan plates, due to which I lost a lot of time.
I then redid the transformations on new plates and could hence see blue and white colonies.
Poured LB, LB+Amp, and LB+Kan plates | |
Week of July 14 | |
This entire week I used the Google Glass for all my wet lab work. This was a part of a study run by the Human Computer Interaction Lab at Wellesley College. This week involved troubleshooting and making more of some Level 0 mini prep stocks were exhausted.
| |
Weeks of July 21 and July 28 | |
Finally, I finished making the Level 1s.
| |
Week of August 4 | |
Troubleshooting for J00-C12m_AE and R10-C40-E40m_EF units
| |
Week of August 11 | |
Testing WPI constructs and more cloning issues
| |
Week of August 18 and August 25 | |
More FACS testing
| |
Week of August 24 | |
|