Team:BostonU/FusionProteinsNotebook
From 2014.igem.org
(Difference between revisions)
Line 13: | Line 13: | ||
<table width="100%" border="0" cellspacing="15" cellpadding="0"> | <table width="100%" border="0" cellspacing="15" cellpadding="0"> | ||
<tr> | <tr> | ||
- | < | + | <td scope="col"> The notebook below describes all the steps that were taken in constructing, and testing fusion proteins. The following ladder was used to determine the size of bands on all gel images in this notebook</td> </tr> |
<br><br> | <br><br> | ||
<tr> | <tr> | ||
- | < | + | <td scope="col"> |
- | <left><img src="https://static.igem.org/mediawiki/2014/9/9e/N3200_thumb.gif"></left></ | + | <left><img src="https://static.igem.org/mediawiki/2014/9/9e/N3200_thumb.gif"></left></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<br> | <br> | ||
- | < | + | <td colspan="2" scope="col"><br><h2>June</h2></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
- | < | + | <td colspan="2" scope="col"><h3>Week of June 23</h3></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
- | < | + | <td colspan="2" scope="col">Decided to make the following Level 0 Coding Sequences:<br> C0040_CI <br> |
C0080_CI <br> E0040m_ID <br> E0030_ID | C0080_CI <br> E0040m_ID <br> E0030_ID | ||
Line 44: | Line 44: | ||
<tr> | <tr> | ||
- | < | + | <td colspan="2" scope="col"><br><h3>Week of June 30</h3></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
- | < | + | <td colspan="2" scope="col">This week was about sequence verifying the genes made earlier and laying down the plan for final testing of the fusion protein. |
<ul> | <ul> | ||
Line 71: | Line 71: | ||
<br> | <br> | ||
<tr> | <tr> | ||
- | < | + | <td colspan="2" scope="col"><br><h2>July</h2></td> |
</tr> | </tr> | ||
+ | </table> | ||
+ | <table width="100%" border="0" cellspacing="15" cellpadding="0"> | ||
- | <tr>< | + | <tr><td colspan="2" scope="col"><h3>Week of July 7</h3></td></tr> |
- | <tr>< | + | <tr><td colspan="2" scope="col"> This week I ran into problems with Kan plates, due to which I lost a lot of time. |
I then redid the transformations on new plates and could hence see blue and white colonies. | I then redid the transformations on new plates and could hence see blue and white colonies. | ||
<br> | <br> | ||
Line 91: | Line 93: | ||
<br> | <br> | ||
- | <tr>< | + | <tr><td colspan="2" scope="col"><h3>Week of July 14</h3></td></tr> |
- | <tr>< | + | <tr><td colspan="2" scope="col">This entire week I used the Google Glass for all my wet lab work. This was a part of a study run by the Human Computer Interaction Lab at Wellesley College. This week involved troubleshooting and making more of some Level 0 mini prep stocks were exhausted. |
<br> | <br> | ||
Line 116: | Line 118: | ||
</ul> | </ul> | ||
</tr> | </tr> | ||
- | <tr>< | + | <tr><td colspan="2" scope="col"><h3>Weeks of July 21 and July 28</h3></td></tr> |
- | <tr>< | + | <tr><td colspan="2" scope="col">Finally, I finished making the Level 1s. |
<br> | <br> | ||
Line 136: | Line 138: | ||
<br> | <br> | ||
<tr> | <tr> | ||
- | < | + | <td colspan="2" scope="col"><br><h2>August</h2></td> |
</tr> | </tr> | ||
- | <tr>< | + | <tr><td colspan="2" scope="col"><h3>Week of August 4</h3></td></tr> |
- | <tr>< | + | <tr><td colspan="2" scope="col">Troubleshooting for J00-C12m_AE and R10-C40-E40m_EF units |
<br> | <br> | ||
Line 161: | Line 163: | ||
- | <tr>< | + | <tr><td colspan="2" scope="col"><h3>Week of August 11</h3></td></tr> |
- | <tr>< | + | <tr><td colspan="2" scope="col">Testing WPI constructs and more cloning issues |
<br> | <br> | ||
Line 189: | Line 191: | ||
<br> | <br> | ||
</tr> | </tr> | ||
+ | </table> | ||
+ | <table width="100%" border="0" cellspacing="15" cellpadding="0"> | ||
- | |||
- | <tr>< | + | <tr><td colspan="2" scope="col"><h3>Week of August 18 and August 25</h3></td></tr> |
+ | |||
+ | <tr><td colspan="2" scope="col"> More FACS testing | ||
<br> | <br> | ||
Line 216: | Line 221: | ||
<tr> | <tr> | ||
- | < | + | <td colspan="2" scope="col"><br><h2>September</h2></td> |
</tr> | </tr> | ||
- | <tr>< | + | <tr><td colspan="2" scope="col"><h3>Week of September 1</h3></td></tr> |
- | <tr>< | + | <tr><td colspan="2" scope="col"> Started working on assembling Level 2s |
<br> | <br> | ||
Line 250: | Line 255: | ||
</tr> | </tr> | ||
- | <tr>< | + | <tr><td colspan="2" scope="col"><h3>Week of September 8</h3></td></tr> |
- | <tr>< | + | <tr><td colspan="2" scope="col"> Inter Lab Study |
<br> | <br> | ||
<ul> | <ul> | ||
Line 284: | Line 289: | ||
The gel didn't run well and none of the picked colonies had the right size. | The gel didn't run well and none of the picked colonies had the right size. | ||
</tr> | </tr> | ||
+ | </table> | ||
+ | <table width="100%" border="0" cellspacing="15" cellpadding="0"> | ||
- | <tr>< | + | <tr><td colspan="2" scope="col"><h3>Week of September 14 and 21</h3></td></tr> |
- | <tr>< | + | <tr><td colspan="2" scope="col"> Finished Inter-Lab study |
<br> | <br> | ||
<ul> | <ul> | ||
Line 302: | Line 309: | ||
<li> J23106 - E0240 (Cam) | <li> J23106 - E0240 (Cam) | ||
<li> J23115 - E0240 (Cam) | <li> J23115 - E0240 (Cam) | ||
- | <tr>< | + | <tr><td colspan="2" scope="col"> Resumed Phase 1 assembly |
<ul> | <ul> | ||
<li> Started building on Level 2s again using MoClo. | <li> Started building on Level 2s again using MoClo. |
Revision as of 21:54, 15 October 2014
The notebook below describes all the steps that were taken in constructing, and testing fusion proteins. The following ladder was used to determine the size of bands on all gel images in this notebook | |
|
|
June |
|
Week of June 23 |
|
Decided to make the following Level 0 Coding Sequences: C0040_CI C0080_CI E0040m_ID E0030_ID
| |
Week of June 30 |
|
This week was about sequence verifying the genes made earlier and laying down the plan for final testing of the fusion protein.
| |
July |
Week of July 7 | |
This week I ran into problems with Kan plates, due to which I lost a lot of time.
I then redid the transformations on new plates and could hence see blue and white colonies.
Poured LB, LB+Amp, and LB+Kan plates | |
Week of July 14 | |
This entire week I used the Google Glass for all my wet lab work. This was a part of a study run by the Human Computer Interaction Lab at Wellesley College. This week involved troubleshooting and making more of some Level 0 mini prep stocks were exhausted.
| |
Weeks of July 21 and July 28 | |
Finally, I finished making the Level 1s.
| |
August |
|
Week of August 4 | |
Troubleshooting for J00-C12m_AE and R10-C40-E40m_EF units
| |
Week of August 11 | |
Testing WPI constructs and more cloning issues
|
Week of August 18 and August 25 | |
More FACS testing
| |
September |
|
Week of September 1 | |
Started working on assembling Level 2s
| |
Week of September 8 | |
Inter Lab Study
|
Week of September 14 and 21 | |||
Finished Inter-Lab study
|