- | <th scope="col"> The notebook below describes all the steps that were taken in constructing, and testing fusion proteins. </th> </tr> | + | <th scope="col"> The notebook below describes all the steps that were taken in constructing, and testing fusion proteins. The following ladder was used to determine the size of bands on all gel images in this notebook</th> </tr> |
- | + | <center><img src="https://static.igem.org/mediawiki/2014/9/9e/N3200_thumb.gif"></center> | |
<tr> | <tr> | ||
<br> | <br> |
Revision as of 17:00, 8 October 2014
The notebook below describes all the steps that were taken in constructing, and testing fusion proteins. The following ladder was used to determine the size of bands on all gel images in this notebook | |||
---|---|---|---|
June |
|||
Week of June 23 |
|||
Decided to make the following Level 0 Coding Sequences: C0040_CI C0080_CI E0040m_ID E0030_ID
| |||
Week of June 30 |
|||
This week was about sequence verifying the genes made earlier and laying down the plan for final testing of the fusion protein.
| |||
July |
|||
Week of July 7 | |||
This week I ran into problems with Kan plates, due to which I lost a lot of time.
I then redid the transformations on new plates and could hence see blue and white colonies.
Poured LB, LB+Amp, and LB+Kan plates | |||
Week of July 14 | |||
This entire week I used the Google Glass for all my wet lab work. This was a part of a study run by the Human Computer Interaction Lab at Wellesley College. This week involved troubleshooting and making more of some Level 0 mini prep stocks were exhausted.
| |||
Weeks of July 21 and July 28 | |||
Finally, I finished making the Level 1s.
| |||
August |
|||
Week of August 4 | |||
Troubleshooting for J00-C12m_AE and R10-C40-E40m_EF units
| |||
Week of August 11 | |||
Testing WPI constructs and more cloning issues
| |||
Week of August 18 and August 25 | |||
More FACS testing
| |||
September |
|||
Week of September 1 | |||
Started working on assembling Level 2s
| |||
Week of September 8 | |||
Inter Lab Study
| |||
Week of September 14 and 21 | |||
Finished Inter-Lab study
|