Week Five |
Monday, 7/14/14
|
Export Systems
- Redid Gibson assembly of comX constructs to reattempt cloning
- Constructs transformed into JM109, plated on carbenicillin, and incubated overnight
lamBCDA & fsrABC Reception Systems
- Grew liquid cultures of E. coli transformed with pWW2149+pWW1521 and pWW2149+pWW1523 (colonies had been allowed to grow on agar plates over the weekend)
agrBCDA Reception System and Combinatorial Promoters
|
|
Tuesday, 7/15/14
|
Export Systems
- ComX System
- Ran colony PCR again on overnight colonies with reassembled comX constructs (3 colonies picked from each of the 5 plates)
- Ran a gel on the PCR products. Resulting gel.
- agrBD, lamBD, & FsrB Systems
- PCR assembly of backbones with overhangs needed for assembly of agrBD, lamBD, & FsrB export systems
- DpnI digestion of PCR product for 2 hours and then PCR purification were run to remove any non-backbone fragments of DNA
- The five export constructs to test [link to images of the 5 plasmids we constructed] were assembled via Gibson using the PCRed backbones and geneblocks (containing the inserts) that arrived yesterday afternoon
- 1 μL of each of the 5 Gibson products was then transformed into JM109. The bacteria were then plated on 5 carbenicillin plates & incubated @ 37°C overnight
lamBCDA & fsrABC Reception Systems
- Testing the Scaffold System
- Created glycerol stocks of the overnight liquid cultures (with bacteria transformed with pWW2149+pWW1521 and pWW2149+pWW1523) and stored them at -80°C
- The remainder of the overnight cultures were then grown in clear MOPS media
- Different concentrations of arabinose [specifically what concentrations?] were added to separate aliquots of the cultures in a 96-well plate
- GFP fluorescence data was collected from these colonies in a plate reader over [how many hours post-induction?]
- Construction of lam & fsr Reception Systems
- PCRed pKS001 template to extract vector backbone with overhangs for later Gibson assembly
agrBCDA Reception System and Combinatorial Promoters
|
|
Wednesday, 7/16/14
|
|
|
Thursday, 7/17/14
|
|
|
Friday, 7/18/14
|
|
|