Team:The Tech Museum/Notebook
From 2014.igem.org
Line 8: | Line 8: | ||
<tr> | <tr> | ||
<td colspan="3" valign="top"> | <td colspan="3" valign="top"> | ||
- | <p>Timeline of major events:<br> | + | <p><b>Timeline of major events:</b><br></p> |
- | May: Basic concept research and design<br> | + | <p><UL><LI>May: Basic concept research and design<br> |
- | June: Software development initiated; plasmid design started and promoter-RBS’s picked<br> | + | <LI>June: Software development initiated; plasmid design started and promoter-RBS’s picked<br> |
- | July: Wetlab testing of possible color protein combinations<br> | + | <LI>July: Wetlab testing of possible color protein combinations<br> |
- | August 10: Design of complete tri-color plasmids finalized<br> | + | <LI>August 10: Design of complete tri-color plasmids finalized<br> |
- | August 24: Assembly of tri-color plasmid pools completed (DNA2.0)<br> | + | <LI>August 24: Assembly of tri-color plasmid pools completed (DNA2.0)<br> |
- | September 10: Tri-color plasmids optimized on museum wetlab setup<br> | + | <LI>September 10: Tri-color plasmids optimized on museum wetlab setup<br> |
- | September 29: Software fully integrated with hardware on mobile exhibit<br> | + | <LI>September 29: Software fully integrated with hardware on mobile exhibit<br> |
- | September 30 - October 3: Prototyping of mobile exhibit with museum staff and visitors<br> | + | <LI>September 30 - October 3: Prototyping of mobile exhibit with museum staff and visitors<br> |
- | October 6 - October 17: Data collection on the museum floor with visitor!</p> | + | <LI>October 6 - October 17: Data collection on the museum floor with visitor!</UL></p> |
- | <p><b>Biology Details</b></p> | + | <p><b>Biology Details:</b></p> |
<p>Design of tri-color plasmid pool (June 2014)<br> | <p>Design of tri-color plasmid pool (June 2014)<br> | ||
9 promoter-rbs pairs of varying strength from Kosuri et al paper (2013):<br> | 9 promoter-rbs pairs of varying strength from Kosuri et al paper (2013):<br> |
Revision as of 17:38, 17 October 2014
| ||||||||||||||||||||||||||||||||||
Notebook | ||||||||||||||||||||||||||||||||||
Timeline of major events:
Biology Details: Design of tri-color plasmid pool (June 2014)
Selection of colored reporter proteins Final tri-color plasmid designs, assembled by DNA2.0 Optimization of plasmid pools with visitor-accessible museum wetlab set up Safety: |