Team:ETH Zurich/modeling/int

From 2014.igem.org

(Difference between revisions)
(Assumptions)
(Assumptions)
Line 185: Line 185:
;'''Assumption B'''
;'''Assumption B'''
-
:As switching needs two active sites to be effective (for more information on flipping, check the [https://2014.igem.org/Team:ETH_Zurich/modeling/xor XOR gate page]), the switching rate is approximated to: $${(\frac{SA_{Bxb1}}{S_{TOT}})}^2$$ This approximation is understated by probabilistic considerations.
+
:As switching needs two active sites to be effective (for more information on flipping, check the [https://2014.igem.org/Team:ETH_Zurich/modeling/xor XOR gate page]), the switching rate is approximated to: $${\left(\frac{SA_{Bxb1}}{S_{TOT}}\right)}^2$$ This approximation is understated by probabilistic considerations.
;'''Assumption C'''
;'''Assumption C'''

Revision as of 00:55, 18 October 2014

iGEM ETH Zurich 2014