Team:ETH Zurich/modeling/int

From 2014.igem.org

(Difference between revisions)
m (Parameter fitting)
m (Assumptions)
Line 244: Line 244:
;'''Assumption B'''
;'''Assumption B'''
:As switching needs two active sites to be effective (for more information on flipping, check the [https://2014.igem.org/Team:ETH_Zurich/modeling/xor XOR gate page]), the switching rate is approximated to: $${(\frac{SA_{Bxb1}}{S_{TOT}})}^2$$ This approximation is understated by statistical considerations.
:As switching needs two active sites to be effective (for more information on flipping, check the [https://2014.igem.org/Team:ETH_Zurich/modeling/xor XOR gate page]), the switching rate is approximated to: $${(\frac{SA_{Bxb1}}{S_{TOT}})}^2$$ This approximation is understated by statistical considerations.
 +
 +
;'''Assumption C'''
 +
:Given the normalization of the paper, basal rate of production of Bxb1 is not taken into account. Thus, we consider that $$A_L = 0$$
;'''Assumption F'''
;'''Assumption F'''
Line 249: Line 252:
<br/>
<br/>
 +
=== Parameter fitting ===
=== Parameter fitting ===

Revision as of 16:09, 12 October 2014

iGEM ETH Zurich 2014