Team:SZU-China/notebook
From 2014.igem.org
(Difference between revisions)
Line 1: | Line 1: | ||
- | |||
<!--[if lt IE 7 ]><html class="ie ie6" lang="zh-CN"><![endif]--> | <!--[if lt IE 7 ]><html class="ie ie6" lang="zh-CN"><![endif]--> | ||
<!--[if IE 7 ]><html class="ie ie7" lang="zh-CN"><![endif]--> | <!--[if IE 7 ]><html class="ie ie7" lang="zh-CN"><![endif]--> | ||
Line 184: | Line 183: | ||
<div > | <div > | ||
<ul id="menu-navbar" class="nav navbar-nav"> | <ul id="menu-navbar" class="nav navbar-nav"> | ||
- | <li id="menu-item-215" class="menu-item menu-item-type-custom menu-item-object-custom | + | <li id="menu-item-215" class="menu-item menu-item-type-custom menu-item-object-custom menu-item-home menu-item-215"><a title="Home" href="https://2014.igem.org/Team:SZU-China"><i class="fa fa-home"></i> Home</a></li> |
<li id="menu-item-895" class="menu-item menu-item-type-custom menu-item-object-custom menu-item-has-children menu-item-895"><a title="Project" ><i class=" fa fa-edit"></i> Project</a> | <li id="menu-item-895" class="menu-item menu-item-type-custom menu-item-object-custom menu-item-has-children menu-item-895"><a title="Project" ><i class=" fa fa-edit"></i> Project</a> | ||
<ul class="dropdown-menu"> | <ul class="dropdown-menu"> |
Revision as of 16:24, 17 October 2014
Mdfa team
- 01/05/2014-15/06/2014:Research about the previous work of iGEM.
- 15/06/2014: Project idea discussing and determination, group issue asssigned.
- 01/07/2014-22/07/2014: Experiments process design, Meet up with SUSTC-Shenzhen.
- 23/07/2014-01/08/2014: Design the primers needed to amplification the Mdfa
- 04/08/2014-24/08/2014: Constructs the basic parts: BBa_K1350005.Visit the paper mill.
- 25/08/2014-07/09/2014: Constructs the basic parts: BBa_K1350006.
- 08/09/2014-25/09/2014: Test function of BBa_K1350006 and then data analysis
- 01/10/2014-06/10/2014: Constructs the basic parts: BBa_K1350010.
- 06/10/2014-15/10/2014:. Results drawing and made the wiki.
Kil team
- 01/05/2014-15/06/2014: Study previous team wikis.
- 15/06/2014: Project idea discussing and determination, group issue asssigned.
- 01/07/2014-22/07/2014: Experiments process design. Meet up with SUSTC-Shenzhen.
- 01/08/2014-22/08/2014:By gene synthesis to get Kil gene. Visit the paper mill.
- 23/08/2014-01/09/2014: Constructs the basic parts: BBa_K1350001.
- 02/09/2014-14/09/2014: Constructs the basic parts: BBa_K1350002.
- 15/09/2014-30/09/2014: Test function of BBa_K1350002 and then data analysis
- 1/10/2014/2014-15/10/2014: Results drawing and made the wiki
Cellulase team
- 01/05/2014-15/06/2014:Study the previous work of iGEM.
- 15/06/2014: Project idea discussing and determination, group issue asssigned.
- 01/07/2014-22/07/2014: Experiments process design. Meet up with SUSTC-Shenzhen.
- 23/07/2014-01/08/2014: Design the primers needed to amplification the cellulase
- 01/08/2014-15/08/2014: Test function of cellulase in BL21 and then data analysis
- 19/08/2014-20/09/2014: Constructs the basic parts: BBa_K1350003.
- 22/09/2014/2014-15/10/2014: Results drawing and made the wiki
ccdB team
- 01/05/2014-15/06/2014:Research about the previous work of iGEM.
- 15/06/2014: Project idea discussing and determination, group issue asssigned.
- 01/07/2014-22/07/2014: Experiments process design,. Meet up with SUSTC-Shenzhen.
- 01/08/2014-06/08/2014:Study how to use the 2014 DNA Distribution Kit.
- 10/08/2014-31/08/2014: Constructs the basic parts: BBa_K1350000.Visit the paper mill.
- 01/09/2014-10/09/2014: Test the function of BBa_K1350000 and then data analysis.
- 19/09/2014/2014-15/10/2014: Results drawing and made the wiki.