Team:Exeter/LabBook
From 2014.igem.org
-
Lab Book
On this page you can find out more about how our project progressed over time. Our data was originally written in a standard lab book. We have scanned in each page of the book. Each page is listed with along with the page number, the date the page covers, a short description of work carried out that day as well as who did it.
Page No. Date: Description: Carried out by: 1 30/06/14 Transformation of iGEM standardised DNA into plasmids for culturing. RBSs and protocols listed. Martyn Bennet, Beth Hickton 2 31/06/14 Transformation of iGEM DNA into plasmids for culturing, cont. List of promoters transformed./td> Beth Hickton, Edward Muir 3 01/07/14 List of promoters transformed, cont. Transformations were plated. Beth Hickton, Martyn Bennet 4 02/07/14 The previous day transformations were plated. Beth Hickton 5 02/07/14 Transformation of iGEM re-suspended promoters. Beth Hickton 6 02/07/14 Preparation of competent E. coli cells Beth Hickton 7 03/07/14 Promoter transformation results. Jessica Rollit, Martyn Bennet 8 03/07/14 E. coli growth rate. Edward Muir, Beth Hickton 9 04/07/14 Transformation of promoters and gene constructs. Edward Muir, Beth Hickton 10 07/07/14 Putting constructs into the iGEM vector and testing for transformation efficiency. Martyn Bennet, Edward Muir, Beth Hickton 11 08/07/14 12 08/07/14 13 09/07/14 14 10/07/14 15 11/07/14 </tr>
16 11/07/14 17 11/07/14 18 11/07/14 19 11/07/14 20 11/07/14 21 14/07/14 22 14/07/14 23 16/07/14 24 16/07/14 25 16/07/14 26 16/07/14 27 16/07/14 28 17/07/14 29 18/07/14 30 18/07/14 31 18/07/14 32 18/07/14 33 21/07/14 34 22/07/14 35 22/07/14 36 23/07/14 37 23/07/14 38 23/07/14 39 24/07/14 40 24/07/14 41 24/07/14 42 28/07/14 43 28/07/14 44 29/07/14 45 30/07/14 46 31/07/14 47 31/07/14 48 31/07/14 49 31/07/14 50 01/08/14 51 01/08/14 52 05/08/14 53 05/08/14 54 06/08/14 55 06/08/14 56 07/08/14 57 07/08/14 58 11/08/14 59 11/08/14 60 11/08/14 61 12/08/14 62 12/08/14 63 12/08/14 64 13/08/14 65 13/08/14 Exeter | ERASE