Team:Reading/Lab Work
From 2014.igem.org
University of Reading | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
|
Lab Book |
Contents |
||||||||||||||||||||||||||||||||||||||||||||||||
Here we present our lab book: notes, results and any changes to protocols. These notes are mostly unaltered, presented as they were taken over the course of the lab based aspect of the project. Any alterations were to make them more legible for the web. We hope these brief notes offer insight into the daily goings of our lab team. In addition to this all protocols we used are presented on their own page. The lab book is presented in chronological order. All dates are English format ie. DD/MM/YYYY. |
|||||||||||||||||||||||||||||||||||||||||||||||||
14/07/2014 Set up initial cultures of PCC 7942 according to protocol Measured OD750 in order to quantify growth of cyanobacteria. OD measurement preformed according to protocol. |
|||||||||||||||||||||||||||||||||||||||||||||||||
15/07/2014 Following acquisition of DNA ligase we begin BioBrick assembly using protocol available on protocol page.
|
|||||||||||||||||||||||||||||||||||||||||||||||||
17/07/2014 Completed BioBrick assembly by transforming competent NEB 5-alpha E. coli. Transformation was preformed according to protocol
Prepared selection plates containing ampicillin ready for plating according to protocol |
|||||||||||||||||||||||||||||||||||||||||||||||||
18/07/2014 Checked plates from Biobrick assembly the previous day.
|
|||||||||||||||||||||||||||||||||||||||||||||||||
21/07/2014
OD750 of 7942 cultures from 14/07/2014 measured = 0.080.
|
|||||||||||||||||||||||||||||||||||||||||||||||||
22/07/2014 6803 arrived from Howe lab in Cambridge. We also received 3 plasmids for transformation. We have received both wild type (WT) and mutant (terminal oxidase) strains.
Checked OD750 of 7942 cultures = 0.17.
Preformed Gram stain of 6803 using standard protocol and visualised cells under a light microscope. |
|||||||||||||||||||||||||||||||||||||||||||||||||
23/07/2014
Using a new batch of NEB 5-alpha E. coli we retried BioBrick from 17/07/2014.
Checked cultures. Solid 6083 WT showed growth while 7942 subculture did not. |
|||||||||||||||||||||||||||||||||||||||||||||||||
25/07/2014 Checked OD750 of original 7942 and 6803. Data added to online database. |
|||||||||||||||||||||||||||||||||||||||||||||||||
class="title">28/07/2014
Installed new white light. Checked lux of lamp above the incubator. |
|||||||||||||||||||||||||||||||||||||||||||||||||
31/07/2014 Made a fuel cell using 7942 from a culture from 14/07/2014.
|
|||||||||||||||||||||||||||||||||||||||||||||||||
01/08/2014
Started new cultures of the WT and mutant 6803 from 22/07/2014 cultures by placing 1 ml of culture into 100 ml of BG-11 media.
|
|||||||||||||||||||||||||||||||||||||||||||||||||
04/08/2014
Transformed E. coli using 1 plasmid from Cambridge and plated onto amp LB agar plates. Incubated overnight at 37℃. Send 60% glycerol for autoclaving. |
|||||||||||||||||||||||||||||||||||||||||||||||||
05/08/2014 Checked plates from previous days transformations. Took grown colonies and inoculated LB broth in 4 bijous. These were placed on a shaker at 200 rpm 37℃. Could not add antibiotic (Amp) to the broth as it was not available. |
|||||||||||||||||||||||||||||||||||||||||||||||||
06/08/2014
Made glycerol sock of 6803 according to protocol
Took OD of samples
Created new subculture of 6803 WT from the 6803 WT from 28/07/2014.
Fuel cell measuring 0.14V and 5mA
Preformed MiniPrep of plasmid using LB E. coli. Tested concentration of DNA on nanodrop = 35 ul/ml
|
|||||||||||||||||||||||||||||||||||||||||||||||||
07/08/2014
Made kanamycin plates
Preformed transformation using WT 6803 and plasmid send to us by Cambridge.
|
|||||||||||||||||||||||||||||||||||||||||||||||||
08/08/2014
Checked OD of cultures
Pored BG-11 plates
Diluted 6803 WT cultures from 22/07 and 6803 MT from 22/07 to get and OD required for transformation
|
|||||||||||||||||||||||||||||||||||||||||||||||||
14/08/2014
Growing cyanobacteria on carbon fibre
Preformed mini prep according to protocol and checked concentration on nanodrop according to protocol. Plasmid concentrations = 22.1 ng/ul and 29.7 ng/ml
|
|||||||||||||||||||||||||||||||||||||||||||||||||
15/08/2014 Diluted 10ul ampicillin (50 mg/ml) in 10 ml LB to get 50 ug/ml. Send to be autoclaved ready for making plates. |
|||||||||||||||||||||||||||||||||||||||||||||||||
18/08/2014
Checked OD of cultures
Created new cultures of both the WT and the MT from cultures from 06/08/2014 and 01/08/2014
Made BG-11 agar
NaHCO3 stock
|
|||||||||||||||||||||||||||||||||||||||||||||||||
19/08/2014 Sent NaHCO3 and BG-11 to be sterilised |
|||||||||||||||||||||||||||||||||||||||||||||||||
20/08/2014
Made BG-11 plates
NaHCO3 cultures
|
|||||||||||||||||||||||||||||||||||||||||||||||||
26/08/2014
Made 0.6% BG-11 plates as described in protocol
|
|||||||||||||||||||||||||||||||||||||||||||||||||
03/09/2014
Checked ODs
Re-started transformation protocol - innoculating 2 OD ~2
|
|||||||||||||||||||||||||||||||||||||||||||||||||
05/09/2014
Preformed miniprep on E.coli after 2 days of growth. Results unsatisfactory. Left E.coli in incubator over the weekend
Set up liquid cultures of E.coli containing flavin biobrick in preparation for miniprep
|
|||||||||||||||||||||||||||||||||||||||||||||||||
08/09/2014
Collected and preformed serial dilution of pond water. 50 ul of 10-1 to 10-5 was plated onto ager plates. Left at 20℃
Completed miniprep of flavin containing E.coli
Checked temperature of fuel cell - operating at room temperature (22℃)
Preformed ferricyanide assay at 4 pm
--------------------------------------------------
|
|||||||||||||||||||||||||||||||||||||||||||||||||
09/09/2014
Ferricyanide assay at 11 am
--------------------------------------------------
|
|||||||||||||||||||||||||||||||||||||||||||||||||
10/09/2014
Ferricyanide assay at 10:30 am
--------------------------------------------------
Pored BG-11 plates according to protocol
|
|||||||||||||||||||||||||||||||||||||||||||||||||
18/09/2014
Transformed with parts from the registry (Plates location - name):
|
|||||||||||||||||||||||||||||||||||||||||||||||||
23/09/2014
Transformation of 6803 planned according to following table:
|
|||||||||||||||||||||||||||||||||||||||||||||||||
24/09/2014 Did stuff with biobrick. It didn't work. It never works. |
|||||||||||||||||||||||||||||||||||||||||||||||||
25/09/2014
Pond water OD750. Taken at 10:30
|
|||||||||||||||||||||||||||||||||||||||||||||||||
26/09/2014 Did stuff with biobrick. It didn't work. It never works. |
|||||||||||||||||||||||||||||||||||||||||||||||||
29/09/2014
Measurement of pond water cultures
|
rusynbioigem@gmail.com |