Team:Gothenburg/Calendar
From 2014.igem.org
(Difference between revisions)
m |
|||
Line 352: | Line 352: | ||
<div class="summary" id="6-10"> | <div class="summary" id="6-10"> | ||
- | <h1> | + | <h1>10/6/2014</h1> |
<h2 align="center">Safety Instructions</h2> | <h2 align="center">Safety Instructions</h2> | ||
<h4 align="center"> <p> The team received mandatory safety training and general lab routine information. | <h4 align="center"> <p> The team received mandatory safety training and general lab routine information. | ||
Line 359: | Line 359: | ||
<div class="summary" id="6-17"> | <div class="summary" id="6-17"> | ||
- | <h1> | + | <h1>17/6/2014</h1> |
<h2 align="center">Introduction to centrifuges and autoclaves</h2> | <h2 align="center">Introduction to centrifuges and autoclaves</h2> | ||
<h4 align="center"> <p> As a part of the mandatory training required by the SysBio group, the team received instructions on how to operate the centrifuges and autoclaves of the labs. | <h4 align="center"> <p> As a part of the mandatory training required by the SysBio group, the team received instructions on how to operate the centrifuges and autoclaves of the labs. | ||
Line 365: | Line 365: | ||
</div> | </div> | ||
- | <div class="summary" id="6- | + | <div class="summary" id="6-20"> |
+ | <h1>20/6/2014</h1> | ||
+ | <h2 align="center">Finished mandatory training</h2> | ||
+ | <h4 align="center">Our Risk Declaration was approved by the lab manager and our supervisors. We also sign a safety certificate stating that we are aware of the safety instructions and with that, completed the mandatory "check-in list for new incomers" of the lab.</h4> | ||
+ | </div> | ||
+ | |||
+ | <div class="summary" id="6-23"> | ||
<h1>2/6/2014</h1> | <h1>2/6/2014</h1> | ||
- | <h2 align="center"> | + | <h2 align="center">Media Preparation</h2> |
- | <h4 align="center"> | + | <h4 align="center">On the first day of laboration, we prepared LB, YPD and SC-Ura/His/Trp-Leu and YPD media. <br>Click here to see the protocol. [[PUT METHOD]]! |
+ | <br>[[File:20140623_103124.JPG|frameless|300px]],[[File:20140623_115809.JPG|frameless|300px]]</h4> | ||
</div> | </div> | ||
- | |||
- | |||
Revision as of 09:04, 18 July 2014
Team:Goteborg
June
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
|
|
|
|
|
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
10
|
11
|
12
|
13
|
14
|
15
|
16
|
17
|
18
|
19
|
20
|
21
|
22
|
23
|
24
|
25
|
26
|
27
|
28
|
29
|
30
|
|
|
|
|
|
|
10/6/2014
Safety Instructions
The team received mandatory safety training and general lab routine information.
A really cool video about Chalmers' chemical safety routine (recorded at our very own lab!) can be seen in http://www.chalmers.se/insidan/EN/about-chalmers/environmental-work/policies/chemical-safety-routine
17/6/2014
Introduction to centrifuges and autoclaves
As a part of the mandatory training required by the SysBio group, the team received instructions on how to operate the centrifuges and autoclaves of the labs.
We also worked on our risk declaration; a mandatory document containing our experiments descriptions and information about the chemicals we are going to use, their handling, storage and associated risk, as well as waste handling.