Team:Arizona State/notebook
From 2014.igem.org
(Difference between revisions)
Line 79: | Line 79: | ||
<p> </p> | <p> </p> | ||
<p><strong>Project Phases</strong> <br> | <p><strong>Project Phases</strong> <br> | ||
- | June: Project planning and set up | + | <p>June: Project planning and set up</p> |
- | July-October: Synthesis of Fatty acid producing plasmids, such as the TesA plasmid | + | <p>July-October: Synthesis of Fatty acid producing plasmids, such as the TesA plasmid</p> |
- | September - October: Preparation and testing of the ethanol producing parts | + | <p>September - October: Preparation and testing of the ethanol producing parts</p> |
- | October: Preparation and testing of the wax esterase plasmid | + | <p>October: Preparation and testing of the wax esterase plasmid</p> |
</p> | </p> |
Revision as of 03:09, 17 October 2014