Team:Arizona State/notebook

From 2014.igem.org

(Difference between revisions)
Line 79: Line 79:
   <p>&nbsp;</p>
   <p>&nbsp;</p>
   <p><strong>Project Phases</strong> <br>
   <p><strong>Project Phases</strong> <br>
-
     June: Project planning and set up
+
     <p>June: Project planning and set up</p>
-
July-October: Synthesis of Fatty acid producing plasmids, such as the TesA plasmid
+
<p>July-October: Synthesis of Fatty acid producing plasmids, such as the TesA plasmid</p>
-
September - October: Preparation and testing of the ethanol producing parts
+
<p>September - October: Preparation and testing of the ethanol producing parts</p>
-
October: Preparation and testing of the wax esterase plasmid
+
<p>October: Preparation and testing of the wax esterase plasmid</p>
</p>
</p>

Revision as of 03:09, 17 October 2014


 

 

Notebook


 

Project Phases

June: Project planning and set up

July-October: Synthesis of Fatty acid producing plasmids, such as the TesA plasmid

September - October: Preparation and testing of the ethanol producing parts

October: Preparation and testing of the wax esterase plasmid

 


 

Procedures
Gel making/running. Enyzme digestions. Ligations. Testing the parts (David).

 


 

Daily entries from open wet ware?