Team:ETH Zurich/labblog/20140716meet

From 2014.igem.org

(Difference between revisions)
Line 1: Line 1:
-
<html><article class="all meetings" id="20140716"></html>
+
<html><article class="all meetings" date="20140716"></html>
== Week 8  ==  
== Week 8  ==  

Revision as of 14:41, 28 August 2014

Week 8

Wednesday, July 16th

  • Our first Gibson assemblies worked well. Regulator plasmids piG0040, piG0041 and piG0042 have been constructed :

ETH Zurich regulator plasmids.PNG

  • We printed our first mold for millifluidic chip :

ETH Zurich mold.PNG

  • We simulated the whole model with and without riboswitch in Matlab with random parameters for integrases. We are still trying to estimate integrase parameters from the literature but it is very difficult.

Top