Team:Brasil-SP/Results/MainAssemblyMap

From 2014.igem.org

(Difference between revisions)
 
(2 intermediate revisions not shown)
Line 12: Line 12:
-
<p><div align="justify">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;The main assembly map describes all the constructions that would be done in the project, but some of them have not been performed in time of the iGEM deadline. The succesfully constructed assemblies is indicated by a green check point and the unsuccessfull constructions are indicated by a red "X". Click on these assemblies to access the lab form.</div></p>
+
<p><div align="justify">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;The main assembly map describes all the constructions that would be done in the project, but some of them have not been performed in time of the iGEM deadline. The succesfully constructed assemblies are indicated by a green check point and the unsuccessfull constructions are indicated by a red "X". Click on these assemblies to access the lab form.</div></p>
<br>
<br>

Latest revision as of 03:37, 18 October 2014

ResultsBRASILSP.png

Main Assembly Map

     The main assembly map describes all the constructions that would be done in the project, but some of them have not been performed in time of the iGEM deadline. The succesfully constructed assemblies are indicated by a green check point and the unsuccessfull constructions are indicated by a red "X". Click on these assemblies to access the lab form.