Team:Sheffield/modelling
From 2014.igem.org
(Difference between revisions)
Line 41: | Line 41: | ||
<div class="cbp_tmicon">1</div> | <div class="cbp_tmicon">1</div> | ||
<div class="cbp_tmlabel"> | <div class="cbp_tmlabel"> | ||
- | <h2> | + | <h2>Week 2</h2> |
- | <p> | + | <p>Overview |
+ | <br> | ||
+ | This was the week where the initial concepts were conceived. There were 2 under-sink concepts and an In-sewer concept. </p> | ||
</div> | </div> | ||
</li> | </li> |
Revision as of 23:41, 17 October 2014
-
1
Week 2
Overview
This was the week where the initial concepts were conceived. There were 2 under-sink concepts and an In-sewer concept. -
2
bla
bla bla bla
-
3
bla
bla bla bla
-
4
bla
bla bla bla
-
5
bla
bla bla bla
-
6
bla
bla bla bla
-
7
bla
bla bla bla