Team:WashU StLouis/Notebook/August
From 2014.igem.org
(Difference between revisions)
(6 intermediate revisions not shown) | |||
Line 21: | Line 21: | ||
href="https://2014.igem.org/Team:WashU_StLouis/Notebook/June">June</a> | href="https://2014.igem.org/Team:WashU_StLouis/Notebook/June">June</a> | ||
| <a | | <a | ||
- | href="https://2014.igem.org/Team:WashU_StLouis/Notebook/July">July</a> | + | href="https://2014.igem.org/Team:WashU_StLouis/Notebook/July">July</a> |
- | | <a | + | | <a href="https://2014.igem.org/Team:WashU_StLouis/Notebook/September">School Year</a></h3> |
- | href="https://2014.igem.org/Team:WashU_StLouis/Notebook/ | + | |
- | + | ||
</div> | </div> | ||
- | <center> <img style="border: 0px solid ; width: | + | <center> <img style="border: 0px solid ; width: 100%" alt="August Calendar" src="https://static.igem.org/mediawiki/2014/9/9c/WashU_August_Calendar.png"> </center> <br><br> |
<body> | <body> | ||
<br> | <br> | ||
Line 48: | Line 46: | ||
Had our final Worldly Wednesday at Blueberry Hill before people started | Had our final Worldly Wednesday at Blueberry Hill before people started | ||
leaving campus before school starts.<br> | leaving campus before school starts.<br> | ||
+ | Website rearranged formatting of the basic page. Change color scheme and background. <br> | ||
Jeffrey left the team for the summer to go abroad.</td> | Jeffrey left the team for the summer to go abroad.</td> | ||
</tr> | </tr> | ||
Line 55: | Line 54: | ||
src="https://static.igem.org/mediawiki/2014/e/ec/WashU_Week_11.JPG"><br> | src="https://static.igem.org/mediawiki/2014/e/ec/WashU_Week_11.JPG"><br> | ||
</td> | </td> | ||
- | <td style="vertical-align: top; text-align: center;"> <span | + | <td style="vertical-align: top; text-align: center;"> |
- | style="font-weight: bold;">Week Eleven- August 11-17</span><br> | + | <span style="font-weight: bold;">Week Eleven- August 11-17</span><br><div style="text-align: left;"> |
- | Presented our preliminary results to Pakrasi Group and all of the | + | |
- | advisors. <br> | + | |
+ | |||
+ | Presented our preliminary results to Pakrasi Group and all of the advisors. <br> | ||
+ | |||
Ben started and tested new positive control and found that it did not | Ben started and tested new positive control and found that it did not | ||
fluoresce as expected and suspect a faulty RBS. Started design of | fluoresce as expected and suspect a faulty RBS. Started design of | ||
- | primers to modify the RBS of the system.</td> | + | primers to modify the RBS of the system.</div></td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 68: | Line 70: | ||
src="https://static.igem.org/mediawiki/2014/2/23/WashU_Week_onwards.jpg"><br> | src="https://static.igem.org/mediawiki/2014/2/23/WashU_Week_onwards.jpg"><br> | ||
</td> | </td> | ||
- | <td style="vertical-align: top; text-align: center;"><span | + | <td style="vertical-align: top; text-align: center;"><span style="font-weight: bold;">Week Twelve- August 25 - 31</span><br><div style="text-align: left;"> |
- | style="font-weight: bold;">Week Twelve- August 25 - | + | School year started. <br>Rebstock group continued to use acetylene reduction assay to test nitrogen fixation activity of JM109 and WM1788 under known optimal conditions.<br> |
- | School year started. | + | Meanwhile Rebstock group started to plan specific protocol and design for BioBricking the <i>nif</i> plasmid.<br> |
- | + | Ben starting cloning project to test whether switching the rbs to a comparable one would fix the EYFP expression in the light plasmids. He sent the clones in for sequencing.</i> | |
- | </td> | + | Ben also worked on the title and abstract for the iGEM September 1st deadline. |
+ | |||
+ | </div></td> | ||
</tr> | </tr> | ||
</tbody> | </tbody> | ||
Line 87: | Line 91: | ||
</td> | </td> | ||
</tr> | </tr> | ||
+ | </table> | ||
</table> | </table> | ||
</html> | </html> | ||
{{:Team:WashU_StLouis/footer}} | {{:Team:WashU_StLouis/footer}} |
Latest revision as of 22:15, 17 October 2014
|