Team:WashU StLouis/Notebook/August

From 2014.igem.org

(Difference between revisions)
 
(7 intermediate revisions not shown)
Line 16: Line 16:
<tr> <td>
<tr> <td>
<h1> <center><b>August</b> </center></h1>
<h1> <center><b>August</b> </center></h1>
-
<center> <img style="border: 0px solid ; width: 1024px;" alt="August Calendar" src="https://static.igem.org/mediawiki/2014/9/9c/WashU_August_Calendar.png"> </center> <br><br>
+
<div style="text-align: center;">
 +
<h3><a href="https://2014.igem.org/Team:WashU_StLouis/Notebook">Notebook</a>
 +
&nbsp;&nbsp;&nbsp; |&nbsp;&nbsp; &nbsp; <a
 +
href="https://2014.igem.org/Team:WashU_StLouis/Notebook/June">June</a>
 +
&nbsp;&nbsp;&nbsp; |&nbsp;&nbsp; &nbsp; <a
 +
href="https://2014.igem.org/Team:WashU_StLouis/Notebook/July">July</a>
 +
&nbsp;&nbsp;&nbsp; |&nbsp;&nbsp; &nbsp; <a href="https://2014.igem.org/Team:WashU_StLouis/Notebook/September">School Year</a></h3>
 +
</div>
 +
<center> <img style="border: 0px solid ; width: 100%" alt="August Calendar" src="https://static.igem.org/mediawiki/2014/9/9c/WashU_August_Calendar.png"> </center> <br><br>
<body>
<body>
<br>
<br>
Line 38: Line 46:
Had our final Worldly Wednesday at Blueberry Hill before people started
Had our final Worldly Wednesday at Blueberry Hill before people started
leaving campus before school starts.<br>
leaving campus before school starts.<br>
 +
Website rearranged formatting of the basic page. Change color scheme and background. <br>
Jeffrey left the team for the summer to go abroad.</td>
Jeffrey left the team for the summer to go abroad.</td>
</tr>
</tr>
Line 45: Line 54:
src="https://static.igem.org/mediawiki/2014/e/ec/WashU_Week_11.JPG"><br>
src="https://static.igem.org/mediawiki/2014/e/ec/WashU_Week_11.JPG"><br>
</td>
</td>
-
<td style="vertical-align: top; text-align: center;"> <span
+
<td style="vertical-align: top; text-align: center;">
-
style="font-weight: bold;">Week Eleven- August 11-17</span><br>
+
      <span style="font-weight: bold;">Week Eleven- August 11-17</span><br><div style="text-align: left;">
-
Presented our preliminary results to Pakrasi Group and all of the
+
 
-
advisors. <br>
+
     
 +
 
 +
Presented our preliminary results to Pakrasi Group and all of the advisors. <br>
 +
 
Ben started and tested new positive control and found that it did not
Ben started and tested new positive control and found that it did not
fluoresce as expected and suspect a faulty RBS. Started design of
fluoresce as expected and suspect a faulty RBS. Started design of
-
primers to modify the RBS of the system.</td>
+
primers to modify the RBS of the system.</div></td>
</tr>
</tr>
<tr>
<tr>
Line 58: Line 70:
src="https://static.igem.org/mediawiki/2014/2/23/WashU_Week_onwards.jpg"><br>
src="https://static.igem.org/mediawiki/2014/2/23/WashU_Week_onwards.jpg"><br>
</td>
</td>
-
<td style="vertical-align: top; text-align: center;"><span
+
<td style="vertical-align: top; text-align: center;"><span style="font-weight: bold;">Week Twelve- August 25 - 31</span><br><div style="text-align: left;">
-
style="font-weight: bold;">Week Twelve- August 25 - End</span><br>
+
School year started. <br>Rebstock group continued to use acetylene reduction assay to test nitrogen fixation activity of JM109 and WM1788 under known optimal conditions.<br>
-
School year started. Continued clonin projects and troubleshooting. Get
+
Meanwhile Rebstock group started to plan specific protocol and design for BioBricking the <i>nif</i> plasmid.<br>
-
ready for biobricking.<br>
+
Ben starting cloning project to test whether switching the rbs to a comparable one would fix the EYFP expression in the light plasmids. He sent the clones in for sequencing.</i>
-
</td>
+
Ben also worked on the title and abstract for the iGEM September 1st deadline.
 +
 
 +
      </div></td>
</tr>
</tr>
</tbody>
</tbody>
Line 77: Line 91:
</td>
</td>
</tr>
</tr>
 +
</table>
</table>
</table>
</html>
</html>
{{:Team:WashU_StLouis/footer}}
{{:Team:WashU_StLouis/footer}}

Latest revision as of 22:15, 17 October 2014