Team:SZU-China/notebook
From 2014.igem.org
(Difference between revisions)
Line 224: | Line 224: | ||
</ul> | </ul> | ||
</li> | </li> | ||
- | <li id="menu-item-1070" class="menu-item menu-item-type-post_type menu-item-object-page menu-item-1070"><a href="https://2014.igem.org/Team:SZU-China/notebook"><i class="fa fa-book"></i>NoteBook</a></li> | + | <li id="menu-item-1070" class="menu-item menu-item-type-post_type menu-item-object-page menu-item-1070 current-menu-item current_page_item"><a href="https://2014.igem.org/Team:SZU-China/notebook"><i class="fa fa-book"></i>NoteBook</a></li> |
</ul> | </ul> | ||
</div> | </div> |
Revision as of 16:24, 17 October 2014
Mdfa team
- 01/05/2014-15/06/2014:Research about the previous work of iGEM.
- 15/06/2014: Project idea discussing and determination, group issue asssigned.
- 01/07/2014-22/07/2014: Experiments process design, Meet up with SUSTC-Shenzhen.
- 23/07/2014-01/08/2014: Design the primers needed to amplification the Mdfa
- 04/08/2014-24/08/2014: Constructs the basic parts: BBa_K1350005.Visit the paper mill.
- 25/08/2014-07/09/2014: Constructs the basic parts: BBa_K1350006.
- 08/09/2014-25/09/2014: Test function of BBa_K1350006 and then data analysis
- 01/10/2014-06/10/2014: Constructs the basic parts: BBa_K1350010.
- 06/10/2014-15/10/2014:. Results drawing and made the wiki.
Kil team
- 01/05/2014-15/06/2014: Study previous team wikis.
- 15/06/2014: Project idea discussing and determination, group issue asssigned.
- 01/07/2014-22/07/2014: Experiments process design. Meet up with SUSTC-Shenzhen.
- 01/08/2014-22/08/2014:By gene synthesis to get Kil gene. Visit the paper mill.
- 23/08/2014-01/09/2014: Constructs the basic parts: BBa_K1350001.
- 02/09/2014-14/09/2014: Constructs the basic parts: BBa_K1350002.
- 15/09/2014-30/09/2014: Test function of BBa_K1350002 and then data analysis
- 1/10/2014/2014-15/10/2014: Results drawing and made the wiki
Cellulase team
- 01/05/2014-15/06/2014:Study the previous work of iGEM.
- 15/06/2014: Project idea discussing and determination, group issue asssigned.
- 01/07/2014-22/07/2014: Experiments process design. Meet up with SUSTC-Shenzhen.
- 23/07/2014-01/08/2014: Design the primers needed to amplification the cellulase
- 01/08/2014-15/08/2014: Test function of cellulase in BL21 and then data analysis
- 19/08/2014-20/09/2014: Constructs the basic parts: BBa_K1350003.
- 22/09/2014/2014-15/10/2014: Results drawing and made the wiki
ccdB team
- 01/05/2014-15/06/2014:Research about the previous work of iGEM.
- 15/06/2014: Project idea discussing and determination, group issue asssigned.
- 01/07/2014-22/07/2014: Experiments process design,. Meet up with SUSTC-Shenzhen.
- 01/08/2014-06/08/2014:Study how to use the 2014 DNA Distribution Kit.
- 10/08/2014-31/08/2014: Constructs the basic parts: BBa_K1350000.Visit the paper mill.
- 01/09/2014-10/09/2014: Test the function of BBa_K1350000 and then data analysis.
- 19/09/2014/2014-15/10/2014: Results drawing and made the wiki.