Team:ETH Zurich/labblog/20140716meet

From 2014.igem.org

(Difference between revisions)
(Week 8)
 
(9 intermediate revisions not shown)
Line 1: Line 1:
-
<html><article class="all meetings" id="20140716"></html>
+
<html><article class="mix meetings carousel" id='week8' date="20140716"></html>
-
== Week 8 ==  
+
== Week 8 : Plasmdis assembly, First mold 3D printed ==  
==== Wednesday, July 16th ====
==== Wednesday, July 16th ====
* Our first Gibson assemblies worked well. Regulator plasmids piG0040, piG0041 and piG0042 have been constructed :
* Our first Gibson assemblies worked well. Regulator plasmids piG0040, piG0041 and piG0042 have been constructed :
-
[[File:ETH Zurich regulator plasmids.PNG|700px]]
+
[[File:ETH Zurich regulator plasmids.PNG|center|700px|thumb|Regulator plasmids construction plan]]
* We printed our first mold for millifluidic chip :
* We printed our first mold for millifluidic chip :
-
[[File:ETH Zurich mold.PNG|500px]]
+
[[File:ETH Zurich mold.PNG|center|500px|thumb|Our first mold for millifluidic chip]]
* We simulated the whole model with and without riboswitch in Matlab with random parameters for integrases. We are still trying to estimate integrase parameters from the literature but it is very difficult.
* We simulated the whole model with and without riboswitch in Matlab with random parameters for integrases. We are still trying to estimate integrase parameters from the literature but it is very difficult.
-
[[#top|Top]]
+
 
-
<html></article></html>
+
{{:Team:ETH Zurich/tpl/topbutton|silver}}
 +
 
 +
{{:Team:ETH Zurich/tpl/rmbutton|silver|week8}}
 +
 
 +
<html> </article></html>

Latest revision as of 21:48, 11 October 2014