Team:ETH Zurich/labblog/20140730meet

From 2014.igem.org

(Difference between revisions)
 
(4 intermediate revisions not shown)
Line 1: Line 1:
-
<html><article class="all meetings milli plasmids beads" date="20140730"></html>
+
<html><article class="mix meetings carousel" id='week10' date="20140730"></html>
-
== Week 10 ==  
+
== Week 10: Chip design, Plasmid assembly, Bead production ==  
==== Wednesday, July 30th ====
==== Wednesday, July 30th ====
-
* We designed two possibilities for the chip : either cells laying on agar or punched cylinders in the agar.  
+
* We designed two possibilities for the chip: either cells laying on agar or punched cylinders in the agar.  
[[File:ETH Zurich Comsol2.PNG|center|800px|thumb|Comsol simulations of a part of the future chip, in two different designs : droplets of cells laying on the agar or introduced in a punched cylinder in the agar. Cells are producing AHL which diffuses through the channels.]]
[[File:ETH Zurich Comsol2.PNG|center|800px|thumb|Comsol simulations of a part of the future chip, in two different designs : droplets of cells laying on the agar or introduced in a punched cylinder in the agar. Cells are producing AHL which diffuses through the channels.]]
* 8 out of 21 plasmids were positively sequenced. 7 further plasmids are sent for sequencing.
* 8 out of 21 plasmids were positively sequenced. 7 further plasmids are sent for sequencing.
Line 11: Line 11:
[[File:ETH Zurich Beads1.PNG|center|500px|thumb|One of our first alginate beads]]
[[File:ETH Zurich Beads1.PNG|center|500px|thumb|One of our first alginate beads]]
-
{{:Team:ETH Zurich/tpl/topbutton}}
+
{{:Team:ETH Zurich/tpl/topbutton|silver}}
 +
 
 +
{{:Team:ETH Zurich/tpl/rmbutton|silver|week10}}
<html> </article></html>
<html> </article></html>

Latest revision as of 21:45, 11 October 2014