Team:SZU-China/notebook

From 2014.igem.org

(Difference between revisions)
 
Line 374: Line 374:
     <div class="container">For better browser experience,please use chrome or firefox.<br>
     <div class="container">For better browser experience,please use chrome or firefox.<br>
       ©2014 SZU-China  
       ©2014 SZU-China  
 +
<a rel="license" href="http://creativecommons.org/licenses/by-sa/3.0/"><img alt="Creative Commons License" style="border-width:0" src="https://i.creativecommons.org/l/by-sa/3.0/88x31.png" /></a><br />
 +
      This work is licensed under a <a rel="license" href="http://creativecommons.org/licenses/by-sa/3.0/">Creative Commons Attribution-ShareAlike 3.0 Unported License</a>.
       <!--统计代码开始-->  
       <!--统计代码开始-->  
       <script type="text/javascript">
       <script type="text/javascript">

Latest revision as of 02:40, 18 October 2014

SZU-China

Mdfa team
  • 01/05/2014-15/06/2014:Research about the previous work of iGEM.
  • 15/06/2014: Project idea discussing and determination, group issue asssigned.
  • 01/07/2014-22/07/2014: Experiments process design, Meet up with SUSTC-Shenzhen.
  • 23/07/2014-01/08/2014: Design the primers needed to amplification the Mdfa
  • 04/08/2014-24/08/2014: Constructs the basic parts: BBa_K1350005.Visit the paper mill.
  • 25/08/2014-07/09/2014: Constructs the basic parts: BBa_K1350006.
  • 08/09/2014-25/09/2014: Test function of BBa_K1350006 and then data analysis
  • 01/10/2014-06/10/2014: Constructs the basic parts: BBa_K1350010.
  • 06/10/2014-15/10/2014:. Results drawing and made the wiki.

Kil team

  • 01/05/2014-15/06/2014: Study previous team wikis.
  • 15/06/2014: Project idea discussing and determination, group issue asssigned.
  • 01/07/2014-22/07/2014: Experiments process design. Meet up with SUSTC-Shenzhen.
  • 01/08/2014-22/08/2014:By gene synthesis to get Kil gene. Visit the paper mill.
  • 23/08/2014-01/09/2014: Constructs the basic parts: BBa_K1350001.
  • 02/09/2014-14/09/2014: Constructs the basic parts: BBa_K1350002.
  • 15/09/2014-30/09/2014: Test function of BBa_K1350002 and then data analysis
  • 1/10/2014/2014-15/10/2014: Results drawing and made the wiki

Cellulase team

  • 01/05/2014-15/06/2014:Study the previous work of iGEM.
  • 15/06/2014: Project idea discussing and determination, group issue asssigned.
  • 01/07/2014-22/07/2014: Experiments process design. Meet up with SUSTC-Shenzhen.
  • 23/07/2014-01/08/2014: Design the primers needed to amplification the cellulase
  • 01/08/2014-15/08/2014: Test function of cellulase in BL21 and then data analysis
  • 19/08/2014-20/09/2014: Constructs the basic parts: BBa_K1350003.
  • 22/09/2014/2014-15/10/2014: Results drawing and made the wiki

ccdB team

  • 01/05/2014-15/06/2014:Research about the previous work of iGEM.
  • 15/06/2014: Project idea discussing and determination, group issue asssigned.
  • 01/07/2014-22/07/2014: Experiments process design,. Meet up with SUSTC-Shenzhen.
  • 01/08/2014-06/08/2014:Study how to use the 2014 DNA Distribution Kit.
  • 10/08/2014-31/08/2014: Constructs the basic parts: BBa_K1350000.Visit the paper mill.
  • 01/09/2014-10/09/2014: Test the function of BBa_K1350000 and then data analysis.
  • 19/09/2014/2014-15/10/2014: Results drawing and made the wiki.
-
<

Retrieved from "http://2014.igem.org/Team:SZU-China/notebook"