Team:SZU-China/notebook

From 2014.igem.org

(Difference between revisions)
Line 303: Line 303:
   <li> 01/05/2014-15/06/2014:Research about the previous work of iGEM.</li>
   <li> 01/05/2014-15/06/2014:Research about the previous work of iGEM.</li>
<li>15/06/2014: Project idea discussing and determination, group issue asssigned.</li>
<li>15/06/2014: Project idea discussing and determination, group issue asssigned.</li>
-
<li>01/07/2014-22/07/2014: Experiments process design,. Meet up with SUSTC-Shenzhen.
+
<li>01/07/2014-22/07/2014: Experiments process design,. Meet up with SUSTC-Shenzhen.</li>
<li>01/08/2014-06/08/2014:Study how to use the 2014 DNA Distribution Kit.</li>
<li>01/08/2014-06/08/2014:Study how to use the 2014 DNA Distribution Kit.</li>
<li>10/08/2014-31/08/2014: Constructs the basic parts:  <a href="http://parts.igem.org/wiki/index.php?title=Part:BBa_K1350003" class="alert-info">BBa_K1350000</a>.Visit the paper mill.</li>
<li>10/08/2014-31/08/2014: Constructs the basic parts:  <a href="http://parts.igem.org/wiki/index.php?title=Part:BBa_K1350003" class="alert-info">BBa_K1350000</a>.Visit the paper mill.</li>
Line 313: Line 313:
   </div>
   </div>
 +
</div>
</div>
</div>
-
 
+
</div>
-
 
+
</div>
Line 323: Line 324:
-
-
</div>
</div>
 +
<!-- 大型设备文章显示结束 -->
<!-- 大型设备文章显示结束 -->
-
<footer id="zan-footer">
+
<<footer id="zan-footer">
   <section class="zan-link" id="zan-link">
   <section class="zan-link" id="zan-link">
-
 
+
    <div class="container">
       <div class="row">
       <div class="row">
         <div class="col-md-4">
         <div class="col-md-4">
Line 364: Line 366:
         </div>
         </div>
       </div>
       </div>
-
+
    </div>
-
 
+
    </div>
   </section>
   </section>
   <section class="footer-space">
   <section class="footer-space">
Line 381: Line 383:
   </section>
   </section>
</footer>
</footer>
-
 
+
</div>
<!--这是往上的插件-->
<!--这是往上的插件-->
Line 388: Line 390:
</div>
</div>
<!--end-->
<!--end-->
-
 
</body>
</body>
</html>
</html>

Revision as of 16:23, 17 October 2014

SZU-China

Mdfa team
  • 01/05/2014-15/06/2014:Research about the previous work of iGEM.
  • 15/06/2014: Project idea discussing and determination, group issue asssigned.
  • 01/07/2014-22/07/2014: Experiments process design, Meet up with SUSTC-Shenzhen.
  • 23/07/2014-01/08/2014: Design the primers needed to amplification the Mdfa
  • 04/08/2014-24/08/2014: Constructs the basic parts: BBa_K1350005.Visit the paper mill.
  • 25/08/2014-07/09/2014: Constructs the basic parts: BBa_K1350006.
  • 08/09/2014-25/09/2014: Test function of BBa_K1350006 and then data analysis
  • 01/10/2014-06/10/2014: Constructs the basic parts: BBa_K1350010.
  • 06/10/2014-15/10/2014:. Results drawing and made the wiki.

Kil team

  • 01/05/2014-15/06/2014: Study previous team wikis.
  • 15/06/2014: Project idea discussing and determination, group issue asssigned.
  • 01/07/2014-22/07/2014: Experiments process design. Meet up with SUSTC-Shenzhen.
  • 01/08/2014-22/08/2014:By gene synthesis to get Kil gene. Visit the paper mill.
  • 23/08/2014-01/09/2014: Constructs the basic parts: BBa_K1350001.
  • 02/09/2014-14/09/2014: Constructs the basic parts: BBa_K1350002.
  • 15/09/2014-30/09/2014: Test function of BBa_K1350002 and then data analysis
  • 1/10/2014/2014-15/10/2014: Results drawing and made the wiki

Cellulase team

  • 01/05/2014-15/06/2014:Study the previous work of iGEM.
  • 15/06/2014: Project idea discussing and determination, group issue asssigned.
  • 01/07/2014-22/07/2014: Experiments process design. Meet up with SUSTC-Shenzhen.
  • 23/07/2014-01/08/2014: Design the primers needed to amplification the cellulase
  • 01/08/2014-15/08/2014: Test function of cellulase in BL21 and then data analysis
  • 19/08/2014-20/09/2014: Constructs the basic parts: BBa_K1350003.
  • 22/09/2014/2014-15/10/2014: Results drawing and made the wiki

ccdB team

  • 01/05/2014-15/06/2014:Research about the previous work of iGEM.
  • 15/06/2014: Project idea discussing and determination, group issue asssigned.
  • 01/07/2014-22/07/2014: Experiments process design,. Meet up with SUSTC-Shenzhen.
  • 01/08/2014-06/08/2014:Study how to use the 2014 DNA Distribution Kit.
  • 10/08/2014-31/08/2014: Constructs the basic parts: BBa_K1350000.Visit the paper mill.
  • 01/09/2014-10/09/2014: Test the function of BBa_K1350000 and then data analysis.
  • 19/09/2014/2014-15/10/2014: Results drawing and made the wiki.
-
<

Retrieved from "http://2014.igem.org/Team:SZU-China/notebook"