Team:ETH Zurich/labblog/20140901meet

From 2014.igem.org

(Difference between revisions)
(Created page with "<html><article class="all meetings" date="20140901"></html> == Week 14 == ==== Monday 1st September ==== * We finally managed to retrieve integrase parameters from Bonnet et a...")
(Week 14)
Line 4: Line 4:
==== Monday 1st September ====
==== Monday 1st September ====
-
* We finally managed to retrieve integrase parameters from Bonnet et al.'s <sup>[[Team:ETH_Zurich/project/references#refEmergence|[9]]]</sup> paper steady state behavior curve. We can get Hill function parameters this way, but still need dynamic data from our own experiments to retrieve dynamic parameters (i. e. degradation rates).
+
* We finally managed to retrieve integrase parameters from Bonnet et al.'s <sup>[[Team:ETH_Zurich/project/references#refEmergence|[9]]]</sup> paper steady state behavior curve. You can check  <html> <a class="all" id="insidelink" href="https://2014.igem.org/Team:ETH_Zurich/blog#intparam"> the corresponding article </a> </html>  for more details. We can get Hill function parameters this way, but still need dynamic data from our own experiments to retrieve dynamic parameters (i. e. degradation rates).
* Integrase don't seem to switch the terminator at the moment, maybe because of a mutation that we found in their sequence.
* Integrase don't seem to switch the terminator at the moment, maybe because of a mutation that we found in their sequence.

Revision as of 10:51, 8 September 2014

Week 14

Monday 1st September

  • We finally managed to retrieve integrase parameters from Bonnet et al.'s [9] paper steady state behavior curve. You can check the corresponding article for more details. We can get Hill function parameters this way, but still need dynamic data from our own experiments to retrieve dynamic parameters (i. e. degradation rates).
  • Integrase don't seem to switch the terminator at the moment, maybe because of a mutation that we found in their sequence.

top