Team:ETH Zurich/labblog/20140702meet

From 2014.igem.org

(Difference between revisions)
Line 1: Line 1:
-
<html><li><article class="all meetings" id="20140702"></html>
+
<html><article class="all meetings" id="20140702"></html>
== Week 6  ==  
== Week 6  ==  
Line 20: Line 20:
* We simulated quorum sensing without leakiness on Matlab, with parameters from the literature.
* We simulated quorum sensing without leakiness on Matlab, with parameters from the literature.
[[#top|Top]]
[[#top|Top]]
-
<html></article></li></html>
+
<html></article></html>

Revision as of 14:09, 28 August 2014

Week 6

Wednesday, July 2nd

  • We have a clear organization of the different experiments we would like to perform.

ETH Zurich tasks.PNG ETH Zurich tasks2.PNG

We want to optimize quorum sensing to have non-leaky non-cross-talking constructs. We want to prevent cross-talk between integrases and check their dynamics with different quorum sensing promoters. Then we will test the XOR gate without production of LuxI, to check how it works without the loop, and we will finally test our final construct with the loop, hoping that the delay between GFP production and the possible second switching due to AHL production is long enough to have enough fluorescence.

The red line is our critical timeline. Numbers of days are very optimistic,therefore we multiply the whole timeline by 2. The stars stand for modeling inputs. ETH Zurich tasks3.PNG

  • We have also clear plans for the Gibson assemblies to perform. As an example, here is the plan for regulator plasmids :

ETH Zurich regulator progress.png

ETH Zurich facebook.PNG

  • We simulated quorum sensing without leakiness on Matlab, with parameters from the literature.

Top