== Week 6  ==  
+
== Week 6: Project planning, Gibson assemblies planning, First Matlab simulations ==  
==== Wednesday, July 2nd ====
==== Wednesday, July 2nd ====
* We have a clear organization of the different experiments we would like to perform.
* We have a clear organization of the different experiments we would like to perform.
-
[[File:ETH Zurich tasks.PNG|800px]]
+
[[File:ETH Zurich tasks.PNG|500px]] [[File:ETH Zurich tasks2.PNG|500px]]
-
[[File:ETH Zurich tasks2.PNG|800px]]
+
We want to optimize quorum sensing to have non-leaky non-cross-talking constructs. We want to prevent cross-talk between integrases and check their dynamics with different quorum sensing promoters. Then we will test the XOR gate without production of LuxI, to check how it works without the loop, and we will finally test our final construct with the loop, hoping that the delay between GFP production and the possible second switching due to AHL production is long enough to have enough fluorescence.
We want to optimize quorum sensing to have non-leaky non-cross-talking constructs. We want to prevent cross-talk between integrases and check their dynamics with different quorum sensing promoters. Then we will test the XOR gate without production of LuxI, to check how it works without the loop, and we will finally test our final construct with the loop, hoping that the delay between GFP production and the possible second switching due to AHL production is long enough to have enough fluorescence.
The red line is our critical timeline. Numbers of days are very optimistic,therefore we multiply the whole timeline by 2. The stars stand for modeling inputs.
The red line is our critical timeline. Numbers of days are very optimistic,therefore we multiply the whole timeline by 2. The stars stand for modeling inputs.
-
[[File:ETH Zurich tasks3.PNG|800px]]
+
[[File:ETH Zurich tasks3.PNG|center|800px|thumb|Tasks organization with critical timeline in red.]]
*We have also clear plans for the Gibson assemblies to perform. As an example, here is the plan for regulator plasmids :
*We have also clear plans for the Gibson assemblies to perform. As an example, here is the plan for regulator plasmids :
-
[[File:ETH Zurich regulator progress.png|800px]]
+
[[File:ETH Zurich regulator progress.png|center|800px|thumb|Exemple of Gibson assembly plan for regulator constructs]]
* We have a [https://www.facebook.com/iGEM.ETH.Zurich facebook page] !  
* We have a [https://www.facebook.com/iGEM.ETH.Zurich facebook page] !  
-
[[File:ETH Zurich facebook.PNG|400px|link=https://www.facebook.com/iGEM.ETH.Zurich]]
+
[[File:ETH Zurich facebook.PNG|500px|link=https://www.facebook.com/iGEM.ETH.Zurich]]
* We simulated quorum sensing without leakiness on Matlab, with parameters from the literature.
* We simulated quorum sensing without leakiness on Matlab, with parameters from the literature.
-
[[#top|Top]]
+
 
-
<html></article></html>
+
{{:Team:ETH Zurich/tpl/topbutton|silver}}
 +
 
 +
{{:Team:ETH Zurich/tpl/rmbutton|silver|week6}}
 +
 
 +
<html> </article></html>

Latest revision as of 21:51, 11 October 2014