Team:ETH Zurich/labblog/20140618meet

From 2014.igem.org

(Difference between revisions)
(Week 4)
(Week 4)
 
(3 intermediate revisions not shown)
Line 1: Line 1:
-
<html><article class="all meetings" date="20140618"></html>
+
<html><article class="mix meetings carousel" id='week4' date="20140618"></html>
-
== Week 4  ==  
+
== Week 4: Improving plasmid design, Modularization of the whole model ==  
==== Wednesday, June 18th ====
==== Wednesday, June 18th ====
Line 9: Line 9:
Sensor plasmids will be approx. 9.3kb long, and logic plasmids will be approx. 5,2kb long.
Sensor plasmids will be approx. 9.3kb long, and logic plasmids will be approx. 5,2kb long.
-
* From the modeling side, the whole model has been modularized and we have calculated and simulated steady state for the quorum sensing module.
+
* From the modeling side, the whole model has been <html><a id='insidelink' targetid='modularization' href='https://2014.igem.org/Team:ETH_Zurich/blog#modularization'> modularized </a></html> and we have calculated and simulated steady state for the quorum sensing module.
* GeneScript, Microsynth, EraSynbio are willing to support us !
* GeneScript, Microsynth, EraSynbio are willing to support us !
-
{{:Team:ETH Zurich/tpl/topbutton}}
+
{{:Team:ETH Zurich/tpl/topbutton|silver}}
 +
 
 +
{{:Team:ETH Zurich/tpl/rmbutton|silver|week4}}
 +
 
<html> </article></html>
<html> </article></html>

Latest revision as of 21:56, 11 October 2014