Team:CSU Fort Collins/Notebook/DailyNotes

From 2014.igem.org

Revision as of 17:51, 17 October 2014 by Ossmith (Talk | contribs)

Protocols

Table of Contents

← Full Table of Contents

Daily Notes

Daily notes outline the day-to-day activities, procedures, and results of our team and our projects during both wet and dry research.

Biosensor

01June: PAR, PLR, and PFL Assembly
02July: PLR, PFL, and PFL2 Assembly
03August: Scientists vs. the PCR Machine
04September: A New Direction

Breakdown

05July: Lac Promoter and FadD Assembly
06August: More of the Same, But Better
07September: One Thousand and One Nights

High-Value Product

08June: pMBI Assembly
09July: pMBI and pMevT Assembly

Kill Switch

10July: TRP/KillerRed Assembly
11September: Troubleshooting and Biobrick Success